Our own trades · No subcontractors · 212 jobs since 2013 Free survey in 48 hNothing added without your say-soSame faces to the end
Flooring · wood, LVT, tile, resin, sanding

Laid level, tight, and quiet underfoot

Engineered wood, LVT, tile, resin — and sanding back the boards you already have. Ade has laid floors for us since 2020.

Floor layers setting tiles over a levelled subfloor Samples brought to you
1Firm for subfloor and finish
10 yrWorkmanship guarantee
4.9 / 5Rated by homeowners
0Charge for the measure-up
Why homeowners keep our number

Four things you get that you cannot get from a carpet shop fitter

01Subfloor sorted firstLevelled and screeded. A £60 bag of latex saves a £3,000 floor.
02Scribed into every revealCut to skirtings and door linings — no beading hiding a bad cut.
03No hollow spotsFull-spread adhesive or clipped and glued, whichever the floor actually wants.
04Doors still shutUndercut and rehung, thresholds made flush, no catching on the pile.
Who turns up The crew and the yard What the guarantee covers
What it costs · from last year's job book

Pick the job. See the price.

Priced per m² Measured on site, not estimated
{{ pickName }} {{ pickPrice }} {{ pickIncludes }}
On site {{ pickDays }}
Old floor {{ pickScaffold }}
Rates are per square metre for labour and sundries as charged last year; the floor covering itself is at trade cost, shown separately on the quote.
Recent floors · price and days as charged

Three off the last twelve months

They will take your call References on request, not curated
Wimbledon bedroom with sanded and oiled original floorboards
Wimbledon · boards sanded and oiled · £1,320 · 3 days
Chislehurst bathroom with a tiled floor and decoupling mat beneath
Chislehurst · bathroom floor tiled · £860 · 2 days
St Albans kitchen extension with a levelled and laid engineered floor
St Albans · kitchen floor, 34 m² · £2,410 · 4 days
More finished work All 48 recent jobs Decorating after
How it runs

Four steps, same two faces at each

01Measure upAde measures, checks the subfloor with a level and brings samples.
02Written priceLabour per m² and the covering at trade cost, both written down.
03Prepare and layOld floor up, subfloor levelled, floor laid and scribed in.
04Sign-offDoors rehung, trims fitted, waste taken away, aftercare left with you.
On the ground Builders in Harrow
Straight answers

Four we get asked every week

Flooring is one of nine trades out of the Harrow yard.

Do I need the subfloor levelled?

Usually, and it is the cheapest part of the job. Laying a good floor on a bad subfloor is how you get hollow spots and lifting joints in year two.

Can you save my original boards?

If there is thickness left in them, yes — sanding and oiling is far cheaper than replacing, and it is the floor the house was built with.

Will the doors still close?

We undercut and rehang them as part of the job, and make thresholds flush. Nothing gets left catching.

Underfloor heating?

Fine with tile, resin and most engineered wood — we check the tog and the manufacturer limits before quoting, and Tom sets the manifold.

The other nine · same yard, same guarantee
Talk to the foreman, not a call centre

Ask us anything before you commit to anything

07903 650 481
Before you commit Every way to reach us Doors re-hung to suit